We have been trying to come out with a simple way of teaching kids in the rural communities to draw planes as a form of motivation to them take interest in the new health education program.
The girls today, were working on simple design.
Tuesday, 31 January 2012
Sunday, 29 January 2012
Safe flying
The girls are still working on their articles and I am hoping to put them up soon.
They were in there today, in that tower, keeping eyes on the traffic, making safe calls that protect the lives of those pilots that rely on their Radio Telephony.
They were in there today, in that tower, keeping eyes on the traffic, making safe calls that protect the lives of those pilots that rely on their Radio Telephony.
Saturday, 28 January 2012
Flying
It was another day of flying. The visibility is improving which means we will be making more holes in the air.
Friday, 27 January 2012
Article
Many often, we read certain articles, novels, newspaper and many others ; But we sometimes forget to analyze how many new words we have come across just reading. The use of vocabulary in day to day life is such that, we can longer afford to not learn the meaning of new words. The girls today, have started reading the fresh air matters and realized how many words that new to them.
They started writing their own articles which will be going on the blog site soon.
They started writing their own articles which will be going on the blog site soon.
Thursday, 26 January 2012
Engineering
As usual, today was a busy one for the Girls. The X-air falcon that we are working on is making everybody focus in the workshop; they were writing the list of to dos in order for the plane to be ready for the test flight.
During this stage of engineering, everybody is in there; checking and double checking to make sure the plane is to fly. We fueled up the plane to check for leaks and the fuel system passed first time.
During this stage of engineering, everybody is in there; checking and double checking to make sure the plane is to fly. We fueled up the plane to check for leaks and the fuel system passed first time.
Wednesday, 25 January 2012
Finished version

The ladies today, finished their work on the bucket of the K2700.All the drilled holes got riveted and all looking very professional.
This is their first project that involves using lot of new tools they have not used without any supervision and on a working MoM vehicle. I have to say, I believe that the AvTech Girls are making positive changes in their day-to-day development.
Tuesday, 24 January 2012
More design











The girls today made a re-enforcement for the bucket of the K2700 since the existing one is falling apart. First of all, the Girls went through the following steps...
1. Measured the bucket and an appropriate length of steel
2. Cut the marked steel
3. Filed the cut piece with a flat file to remove all sparps
4. Found the mid-point and marked 10mm from each end
5. Marked at pitch 60
6. Drilled with 3mm drill-bit and deburr
7. Sand,de-greased and sprayed with black paint and leave to dry.
Subscribe to:
Posts (Atom)